Bd Civil Info
  • Home
  • Subjective Knowledge
    • Construction Process
    • Surveying
    • Structural
    • Geotechnical
  • Estimating
    • Estimating Info
    • Bricks
    • Reinforcement
    • Concrete
  • AMIE
    • Questions
      • Drawing (Civil)
      • Physics
      • Surveying
      • Mathemetics-1
    • Syllabus
    • Admission Rules
    • Reference Book
  • JOB INFO
    • Govt.
    • Job Site
      • Bdjobs
      • Everjobs
    • Private
    • Marketing
  • Computer Knowledge
    • MS Office
      • MS Word
      • MS Excel
      • MS Powerpoint
    • Auto Cad
    • Revit Architect
    • Adobe Photoshop
  • Contact

Friday, April 28, 2017

Useful Information of Construction Works

 www.bdcivilinfo.blogspot.com     4:29 PM     Bricks, Construction Process, Estimating, Geotechnical, Structural, Subjective Knowledge, Surveying     No comments   


CONCRETE GRADE:
M5 = 1:4:8
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2


CLEAR COVER TO MAIN REINFORCEMENT:
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : 40 mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES : 20/30 mm


WEIGHT OF ROD PER METER LENGTH:
DIA WEIGHT PER METER



6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
1bag cement-50kg
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.f ¬t
1cu.m-35.28cu.f ¬t
1acre-43560sq.f ¬t
1cent-435.6sq.f ¬t
1hectare-2.47ac ¬re
1acre-100cent-4 ¬046.724sq.m
1ground-2400sq. ¬ft
1unit-100cu.ft- ¬2.83cu.m 1square-100sq.f ¬t
1 M LENGTH STEEL ROD I ITS VOLUME
V=(Pi/4)*Dia x DiaX L=(3.14/4)x D x D X 1 (for
1m length) Density of Steel=7850 kg/ cub meter
Weight = Volume x Density=(3.14/4)x D x D X
1x7850 (if D is in mm ) So = ((3.14/4)x D x D X
1x7850)/(1000x1000) = Dodd/162.27


DESIGN MIX:

M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
12.5 mm Jelly : 455 Kg/ M 3
River sand : 794 Kg/ M 3
Total water : 176 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M 3
M25 ( 1 : 2.28 : 3.27)
Cement : 340 Kg/ M 3
20 mm Jelly : 667 Kg/ M 3
12.5 mm Jelly : 445 Kg/ M 3
River sand : 775 Kg/ M 3
Total water : 185 Kg/ M 3
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M 3
Note: sand 775 + 2% moisture, Water185 -20.5 =
164 Liters,
Admixture = 0.5% is 100ml
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture
(170.80+15.20)
M35 ( 1 : 1.79 : 2.57)
Cement : 410 Kg/ M 3
20 mm Jelly : 632 Kg/ M 3
12.5 mm Jelly : 421 Kg/ M 3
River sand : 735 Kg/ M 3
Total water : 200 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2400 Kg/ M 3
Note: sand = 735 + 2%, Water = 200- 14.7 =
185.30,
Admixture = 0.7%
M40 ( 1 : 1.67 : 2.39)
Cement : 430 Kg/ M 3
20 mm Jelly : 618 Kg/ M 3
12.5 mm Jelly : 412 Kg/ M 3
River sand : 718 Kg/ M 3
Water Cement ratio : 0.43
Admixture : 0.7%
Note: Sand = 718 + Bulk age 1%
M45 ( 1 : 1.58 : 2.26)
Cement : 450 Kg/ M 3
20 mm Jelly : 626 Kg/ M 3
12.5 mm Jelly : 417 Kg/ M 3
River sand : 727 Kg/ M 3 + Bulk age 1%
Water Cement ratio : 0.43
Admixture : 0.7%
M50 ( 1 : 1.44 : 2.23)
Cement : 450 Kg/ M 3
20 mm Jelly : 590 Kg/ M 3
12.5 mm Jelly : 483 Kg/ M 3
River sand : 689 Kg/ M 3 + Bulk age 12%
Water Cement ratio : 0.36 (188 Kg)
Admixture : 1.20%3
Micro silica : 30 Kg
Super flow 6.7% of cement
1 cubic meter contains 500 bricks
The Standard size of the 1st class brick is
190mm
x 90mm x
90mm and motor joint should be 10mm thick
So brick with motor=200 x 100 x 100.
Volume of 1st class brick = 0.19 x 0.09 X 0.09 =
0.001539
cu.m
Volume of 1st class brick with motor =0.2 x 0.1 x0.1=0.002 cu.m
No. on bricks per 1cu.m= 1/volume of1st class
brick with
motor
=1/0.002
= 500 no’s of bricks


STANDARD CONVERSION FACTORS

INCH = 25.4 MILLIMETRE
FOOT = 0.3048 METRE
YARD = 0.9144 METRE
MILE = 1.6093 KILOMETER
ACRE = 0.4047 HECTARE
POUND = 0.4536 KILOGRAM
MILLIMETRE= 0.0394 INCH
METRE = 3.2808FOOT
METRE = 1.0936YARD


A rope having length 100cm.You can form any
shape using this rope (Example: Triangle,
Rectangle, etc.,). Which shape will covers

maximum area
1 Newton = o.101971 kg
1 mm2 = 0.01 cm2
1 cm2 = 100 mm2
1 mm2 = 20 N
100 mm2 = 2000N
1 cm2 = 2000N
2000 N = 203.942 kg
So 20 N/ mm2 = 203.942 kg / cm2
RATIO IS 1:1.5:3
  • Share This:  
  •  Facebook
  •  Twitter
  •  Google+
  •  Linkedin
  •  Digg
Email ThisBlogThis!Share to XShare to Facebook
Newer Post Older Post Home

0 comments:

Post a Comment

Popular Posts

  • রাজউক ও পৌরসভার ইমারত নির্মাণ অনুমোদনের জন্য যা করণীয়
    আমরা অনেকেই ভবন নির্মাণ নিয়ে মাথা ঘামাই কিন্তু হয়তোবা জানিনা প্রয়োজনীয় নিয়ম-কানুন অথবা কি কি কাগজপএ রাজউকে বা পৌরসভা জমা দিতে হবে। কিংবা...
  • সেপটিক ট্যাংকের আয়তন
    আসুন আজ সেপটিক ট্যাংকের আয়তন নির্ণয় করতে শিখি : . . ধরি, আমরা ১০০ জন ব্যবহারকারী জন্য সেফটিক ট্যাংক তৈরী করবো... . আমাদের দেশে সিউ...
  • Roof- ছাদ
    আর . সি . সি . মেঝে স্ল্যাবঃ( R.C.C. floor slab) রড সিমেন্ট কংক্রিট দিয়ে নির্মিত সমতল পাতলা ঢালাইকে স্ল্যাব বলে। এটি সাধারণত প্রশস্ত এ...
  • ইট-Bricks
    নির্মাণ সামগ্রী হিসেবে ইট যথেষ্ট গুরুত্বপূর্ণ। ভারবহনকারি দেয়াল, পার্টিশন দেয়াল ইত্যাদি তৈরিতে ইট কাজে লাগে। এছাড়া ইট দিয়ে খোয়া তৈরি ক...
  • সিভিল ইঞ্জিনিয়ারিং কি ? সিভিল ইঞ্জিনিয়ারিং এর শাখা সমূহ।
    সিভিল ইঞ্জিনিয়ারিং কি সংজ্ঞা: ডিজাইন , কনস্ট্রাকশন এবং রক্ষণাবেক্ষন এর প্রকৌশলী বিজ্ঞান। প্রকৌশল জ্ঞান এর মা বলা হয়। সবচেয়ে পুরান ,...
  • বিল্ডিং তৈরীর ধাপ
    একটি বিল্ডিং এর শুরু থেকে শেষ পর্যন্ত ক্রমানুসারে কাজের ধাপ ইংরেজীতে একটা কথা আছে-“A stitch in time saves nine” যাকে বলে সময়ের এক ফোঁ...
  • আর.সি.সি. ফুটিং (R.C.C. Footing )
    আর . সি . সি . ফুটিং ডিজাইনের নীতিসমুহ ( Understand the principles of designing R.C.C. footing) কোন প্রকৌশল কাঠামোর যে অংশ মাটির নিচ...
  • রড নিয়ে সামান্য তথ্য
    বর্তমানে প্রায় সকল রডই ওয়েল্ডেবল। রডের গায়ে N,R,RW,W অংকিত থাকে বলা যায় এগুলো রডের ম্যনুফ্যকচার ডিসক্রিপশান সংক্ষিপ্তাকারে। এগুলো প্রকৌশলীরা...
  • একটি ছয় তলা বিল্ডিং এর শুরু থেকে পর্যন্ত কাজের ধাপ সমূহ:
    ১। সীমানা নির্ধারন ২। লে-আউট, রাজউক সেট ব্যাক চেক ৩। পাইলিং  ক) পাইল পয়েন্ট সেন্টার করা খ) বোরিং করা গ) খাচা বাধা ঘ) ব্লক দেওয়া ঙ) ওয়েল্ড...
  • জমি জমার পরিমাপ
    এখানে একটি পরিমাপকে বিভিন্ন ভাবে তুলে ধরা হয়েছে কারন প্রত্যেকে যেন যার যার সুবিধা মতে সহজে বুঝতে পারেন। ১ অযুতাংশ = ৪ বর্গফুট ৫২.৩৬ ...

Categories

  • Admission Rules
  • AMIE
  • Amie Syllabus
  • Auto Cad
  • Bricks
  • Computer Knowledge
  • Construction Process
  • Contact
  • Earth Quake
  • Estimating
  • Geotechnical
  • Govt Job
  • Job Info
  • Job Site
  • Marketing Job
  • MS Excel
  • MS Office
  • MS Word
  • Private Job
  • Refference Book
  • Reinforcement
  • Structural
  • Subjective Knowledge
  • Surveying

Blog Archive

  • October 2020 (2)
  • January 2019 (1)
  • October 2017 (4)
  • September 2017 (1)
  • June 2017 (1)
  • April 2017 (1)
  • March 2017 (4)
  • February 2017 (8)
  • January 2017 (30)

About Me

www.bdcivilinfo.blogspot.com
View my complete profile

Copyright © Bd Civil Info | Powered by Blogger
Design by Hardeep Asrani | Blogger Theme by NewBloggerThemes.com | Distributed By Gooyaabi Templates