* Project : Padma Multi Purpose Bridge
* Nature : Double Deck, Road at upper and Railway at lower
* Location : Mawa Point in Munshiganj to Janjira point in Shariatpur over the river Padma
* Length : 6.15 KM including approach roads in two sides
* Cost : Tk 288 billion, fully GOB funded
* Project completion : 48 Months, from November 2014 to November 2018
* Beneficiary : 50 million people in 22 South-West districts
* Economic viability : 1.2 per cent growth in the GDP
* Total land acquisition : 646.462 acres from inhabitants of the project site and 142.80 acres government's khas land
* Connecting : 14 KM in two sides
* Piling Depth : 383 feet
* Total Piling number : 264
* Pillars : Total 42. In river 40
* River training : 12 KM on both banks